Home Base Car Kit Progress Cost Sponsors  
   

Job 31 : Rear Panel and Door Levelling

 

 

Hours Spent : 18

 

With the back section now in place I started working on the door levels, the line down the car was slightly lower on the door, so I will use filler to make this consistant, also I needed to use filler to bring the rear arch to the same height as the doors as the door was sitting about 1cm higher.  The side skirt also needed to be brought out about 1cm to match.